EasyManuals Logo
Home>Welch Allyn>Lighting Equipment>LS200 Procedure Light

Welch Allyn LS200 Procedure Light User Manual

Welch Allyn LS200 Procedure Light
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
CAUTION: DISCONNECT LS200 FROM POWER BEFORE SERVICING.
I YOKE R & R
I 1. REMOVE LAMP HOUSING.
REFER TO SECTION H-1, H-4, AND H-5 ON PAGE 20, BUT LEAVE TWO
RED WIRES ATTACHED TO THE SWITCH SINCE IT IS NOT BEING
REMOVED.
I 2. REMOVE LOWER ARM.
REMOVE TWO FLAT HEAD PHILLIPS SCREWS NEAREST JOINT #3
(ADJUSTABLE JOINT), AND SLIDE LOWER ARM OFF OF HINGE BRACKET.
I 3. REMOVE STRAP FROM HINGE BRACKET.
UNSCREW 3/8" NUT FROM STUD. USE SLIP JOINT PLIERS TO PULL
AND LIFT STRAP FROM STUD. (THIS WILL RELIEVE TENSION ON 2
YOKE SCREWS AND PERMITS DISASSEMBLY OF SPRING BRACKET
FROM YOKE STUD.)
I 4. REMOVE STRAIN RELIEF.
COMPRESS STRAIN RELIEF WITH HEYCO TOOL AND REMOVE STRAIN
RELIEF FROM LONG ARM.
I 5. UNSCREW YOKE SET SCREW AT JOINT #2.
USE FLAT BLADE SCREWDRIVER TO UNSCREW YOKE SET SCREW.
I 6. REMOVE YOKE FROM JOINT #2.
UNSCREW TWO FLAT HEAD PHILLIPS SCREWS FROM UPPER ARM AT
YOKE JOINT. WHILE FEEDING CABLE BACK OUT OF YOKE, PULL
YOKE OUT OF JOINT #2. WHEN CONNECTOR PLATE IS ACCESSIBLE,
REMOVE IT FROM CONNECTOR BLOCK/YOKE STUD ASSEMBLY.
TWO FLAT SPRINGS, BRAKE MATERIAL, AND NYLINERS WILL COME
OUT OF CONNECTOR BLOCK. REMOVE END CAPS.
I 7. REMOVE CABLE FROM YOKE.
GENTLY PULL WIRES OUT OF YOKE. DISCARD YOKE.
I 8. ASSEMBLE CONNECTOR BLOCK TO END OF NEW YOKE.
SNAP ONE OF THE END CAPS ONTO THE YOKE. PLACE A SECOND
END CAP ONTO STUD FACING OTHER END CAP. INSERT NYLINERS
TO EACH END OF CONNECTOR BLOCK BORE. FEED THE BLACK/
WHITE WIRES THROUGH STUD INTO YOKE. PLACE THE STUD
PORTION OF THE YOKE INTO THE CONNECTOR BLOCK.
I 9. PLACE THE STRAP/SPRING CONNECTOR PLATE ASSEMBLY ONTO THE
CONNECTOR BLOCK/YOKE ASSEMBLY. PLACE THE BRAKE
MATERIAL AND TWO FLAT SPRINGS (CURVED SIDE UP) INTO THE
OPENING IN THE CONNECTOR BLOCK. POSITION THE CONNECTOR
PLATE OVER THE CONNECTOR BLOCK/YOKE STUD ASSEMBLY WITH
THE ROTATIONAL STOP OF THE STUD ENGAGED WITH THE
CONNECTOR PLATE.
22

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Welch Allyn LS200 Procedure Light and is the answer not in the manual?

Welch Allyn LS200 Procedure Light Specifications

General IconGeneral
BrandWelch Allyn
ModelLS200 Procedure Light
CategoryLighting Equipment
LanguageEnglish

Related product manuals