CAUTION: DISCONNECT LS200 FROM POWER SOURCE BEFORE SERVICING.
K CABLE R & R.
K 1. REMOVE JOINT # 3 (MAIN HINGE WITH KNOB).
FOLLOW INSTRUCTIONS IN SECTION J-1 THROUGH J-4 ON PG.25.
K 2. REMOVE BEZEL.
FOLLOW INSTRUCTIONS IN SECTION A-1 AND A-2 ON PG.13.
K 3. DISCONNECT CABLE FROM POWER SOURCE.
REMOVE FOUR SCREWS TO OPEN TRANSFORMER HOUSING.
DISCONNECT CABLE FROM TRANSFORMER.
K 4. DISCONNECT CABLE FROM LONG ARM.
REMOVE STRAIN RELIEF WITH HEYCO TOOL #29. CUT CONNECTORS
FROM BOTH ENDS OF THE CABLE. PULL FOAM OUT OF YOKE AND
PULL WIRES OUT OF YOKE. REFER TO SECTION I-5 AND I-6 TO
REMOVE YOKE FROM ARM AND TO OBTAIN ACCESS TO THE CABLE.
REMOVE CABLE FROM THE ASSEMBLY BY PULLING FROM THE
STRAIN RELIEF HOLE.
K 5. INSTALL NEW CABLE IN LONG ARM.
PLACE THE CABLE (END WITH LONGER LEADS) IN THROUGH THE
STRAIN RELIEF HOLE OF THE LONG ARM AND OUT THROUGH THE
OTHER END OF THE ARM TUBE. PLACE CORD TUBE OVER THE
CABLE AND INTO THE ARM. SEPARATE THE LONG LEADS. PLACE
THE ELECTRICAL CABLE THROUGH THE CONNECTOR BLOCK/YOKE
ASSEMBLY. PULL THE WIRE UP THROUGH THE YOKE UNTIL THE
INSULATION CAN BE SEEN IN THE YOKE. THE INSULATED PORTION
WILL END AT THE EXIT POINT OF THE WIRES.
IMPORTANT:CHECK THE POSITION OF THE CABLE IN THE ARM. CABLE SHOULD
RUN UNDER THE SPRING/STRAP ASSEMBLY. CORD TUBE SHOULD
COVER THE CABLE ALL THE WAY DOWN TO THE STRAIN RELIEF.
PULL CABLE TO REMOVE SLACK AND SECURE WITH STRAIN RELIEF.
K 6. ATTACH YOKE TO ARM.
REFER TO SECTIONS I-8 THROUGH I-11.
K 7. RESTORE CONNECTIONS AND ATTACH BEZEL.
REFER TO SECTIONS H-9 AND H-10. FOLLOW INSTRUCTIONS IN
SECTION A-3, PAGE 13 TO REPLACE BEZEL.
K 8. INSTALL HINGE ASSEMBLY AND SHORT ARM ASSEMBLY.
REFER TO SECTION J-7 AND J-8 ON PAGES 26-27, TO ATTACH THE
HINGE JOINT#3 TO LS200. REFER TO SECTION J-8, PG. 27 TO ATTACH
THE SHORT ARM ASSEMBLY TO LS200.
K 9. RESTORE WIRING CONNECTIONS IN TRANSFORMER HOUSING.
CRIMP CONNECTORS PN 106134-2 ONTO TRANSFORMER END OF
CABLE. RECONNECT TO SECONDARY CONNECTORS ON
TRANSFORMER. FOLLOW STEP F-5 TO CLOSE HOUSING. 28

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Welch Allyn LS200 Procedure Light and is the answer not in the manual?

Welch Allyn LS200 Procedure Light Specifications

General IconGeneral
BrandWelch Allyn
ModelLS200 Procedure Light
CategoryLighting Equipment
LanguageEnglish

Related product manuals