EasyManuals Logo
Home>Welch Allyn>Lighting Equipment>LS200 Procedure Light

Welch Allyn LS200 Procedure Light User Manual

Welch Allyn LS200 Procedure Light
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
CAUTION: DISCONNECT LS200 FROM POWER SOURCE BEFORE SERVICING.
K CABLE R & R.
K 10. INSTALL SET SCREW AND ADJUST.
PLACE ONE DROP OF LOCTITE 222 M#30375 TO SET SCREW
AND THREAD INTO HOLE. PLACE UNIT IN UPRIGHT POSITION AND
ROTATE JOINT #2 TO THE ‘STOP’. VERY SLOWLY, LOOSEN SET
SCREW UNTIL THE LIGHT HOUSING ROTATES DOWNWARD. STOP
AND TURN THE SCREW CLOCKWISE 1/4 TURN. ROTATE THE LIGHT
HOUSING TO THE ‘STOP’ AND RELEASE. IF THE SET SCREW IS
ADJUSTED PROPERLY, THE LIGHT HOUSING WILL STAY IN POSITION
WHEN RELEASED.
K 11. TEST TO VERIFY SAFE AND PROPER OPERATION.
PERFORM STEP J-9. PERFORM HY-POT TEST PER A-02861.
END CABLE R & R
____________________________________________________________________________
L JOINT #4 / UNIVERSAL CONNECTOR R & R.
L 1. REMOVE CONNECTOR BLOCK.
REFER TO DRAWING #441009 FOR ASSEMBLY. REMOVE SET SCREW
AND TWO PHILLIPS HEAD SCREWS FROM LOWER END OF SHORT
ARM. REMOVE THE END CAP, CONNECTOR PLATE, UNIVERSAL
CONNECTOR, BRAKE, ONE FLAT SPRING AND CONNECTOR BLOCK
AND TWO NYLINERS.
L 2. REASSEMBLE CONNECTOR BLOCK/UNIVERSAL CONNECTOR ASSEMBLY.
PLACE NYLINERS AT EACH END OF THE CONNECTOR BLOCK BORE.
PLACE ONE END CAP ONTO THE UNIVERSAL CONNECTOR. PLACE
THE UNIVERSAL CONNECTOR INTO THE CONNECTOR BLOCK BORE.
PLACE THE BRAKE MATERIAL AND ONE FLAT SPRING (CURVED SIDE
UP) OVER OPENING IN THE CONNECTOR BLOCK.
L 3. SECURE CONNECTOR BLOCK TO SHORT ARM TUBE WITH TWO SCREWS.
FIRST INSTALL THE PHILLIPS SCREW CLOSEST TO THE END OF THE
ARM AND TIGHTEN IT TO A MINIMUM OF 15 INCH LBS. THEN
INSTALL AND TIGHTEN THE SECOND AND LAST SCREW AND
TIGHTEN IT TO THE SAME TORQUE.
L 4.INSTALL SET SCREW AND ADJUST JOINT #4 SET SCREW.
INSTALL SET SCREW WITHOUT LOCTITE. THREAD INTO HOLE. PLACE
THE COMPLETED UNIT ON A TWO DEGREE FROM VERTICAL
MOUNTING. ADJUST THE LONG ARM TO A HORIZONTAL POSITION.
ROTATE LS200 TO THE HIGHER OF THE TWO STOPS. VERY SLOWLY,
LOOSEN SET SCREW UNTIL THE LS200 STARTS TO MOVE TOWARDS THE
LOWER STOP. STOP AND TURN THE SCREW CLOCKWISE 1/4 TURN.
ROTATE THE LS200 TO THE ‘STOP’ AND RELEASE. IF THE SET SCREW IS
ADJUSTED PROPERLY, THE LIGHT HOUSING WILL STAY IN POSITION
WHEN RELEASED.
29

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Welch Allyn LS200 Procedure Light and is the answer not in the manual?

Welch Allyn LS200 Procedure Light Specifications

General IconGeneral
BrandWelch Allyn
ModelLS200 Procedure Light
CategoryLighting Equipment
LanguageEnglish

Related product manuals