31
FINISHING COMMISSIONING -
APPLIANCE
1 Refit the top panel and press down to
compress the seal when fitting the
securing screws (A).
2 Push the front panel up behind the top
panel and push in at the base to secure
the screws (B) with the tool provided.
Always apply pressure at the edges of the
panels when securing to avoid accidental
damage.
Handover:
Complete the guarantee registration card,
commissioning checklist (at the rear of this
manual) and a CD11 or an equivalent
commissioning form.
Set up the controls and show the user how
to operate all the controls shown in the User
Guide, and all system controls.
Where applicable, instruct the customer how
to repressurise the system.
If the appliance is unused and exposed to
freezing conditions, shut off all the mains
supplies and drain the system and boiler to
prevent damage to the system and boiler.
NOTE: Release drain point (K) to drain the
secondary heat exchanger.
A
A
B
B
C
2
1
K
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
38
COMMISSIONING
FINISHING COMMISSIONING -
APPLIANCE
8 716 113 389d 30/3/10 14:01 Page 38

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Worcester 12/18 and is the answer not in the manual?

Worcester 12/18 Specifications

General IconGeneral
BrandWorcester
Model12/18
CategoryBoiler
LanguageEnglish

Related product manuals