27
Connect the MP series download port with PC, click to download the program.
Please donāt cut the power when downloading. Please download again if the power is off.
2-3-3. Communication
Connect MP with Xinje PLC through communication cable. Make sure the MP power supply is
DC24V. Give the power for all the devices.
If the MP screen show communicating, please check the station no., baud rate of both devices.
The connection diagram of MP and other devices please refer to chapter 3.