EasyManuals Logo
Home>ABB>Measuring Instruments>EasyLine Series

ABB EasyLine Series User Manual

ABB EasyLine Series
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
Preparation for Installation 17
Requirements for the Installation Site, Power Supply
NOTE
For the analyzers ZO23 and Fidas24 the information contained in the
sections "ZO23: Preparation for Installation" or "Fidas24: Preparation for
Installation (see page 29)" must be considered in addition.
Requirements for the installation site
The gas analyzer is only intended for installation indoors.
The max. altitude of the installation site may not exceed 2000 m above
sea level.
The installation site must be stable enough to bear the weight of the gas
analyzer!
To ensure safe installation and removal, we recommend that the 19-inch
housing is supported in a cabinet or rack with slide rails!
Short gas paths
Install the gas analyzer as close as possible to the sampling location.
Install the gas conditioning and calibration modules as close as possible
to the gas analyzer.
Adequate air circulation
Provide for adequate natural air circulation around the gas analyzer.
Avoid heat build-up.
Mount (see page 68) several 19-inch housings with a minimum spacing of
1 height unit
between housings.
Protection from adverse conditions
Protect the gas analyzer from:
Cold
Exposure to heat from e.g. the sun, furnaces, boilers
Temperature variations
Strong air currents
Accumulation of dust and ingress of dust
Corrosive atmospheres
Vibrations

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB EasyLine Series and is the answer not in the manual?

ABB EasyLine Series Specifications

General IconGeneral
BrandABB
ModelEasyLine Series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals