EasyManuals Logo
Home>ABB>Robotics>IRB 1400

ABB IRB 1400 User Manual

ABB IRB 1400
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #93 background imageLoading...
Page #93 background image
4 Repair
4.6.2 Changing the cabling in axes 1, 2 and 3
3HAC021111-001 Revision: B 91
4.6.2 Changing the cabling in axes 1, 2 and 3
See foldouts 3 and 4 (7 for IRB 1400H) in the list of spare parts.
To dismantle 1. Remove the cover of the motors.
2. Remove the flange plate <4/138>.
3. Loosen connectors R1.MP, R2.FB1-3.
4. Cut tie around bundle and detach the cable brackets.
5. Detach the cable guides <3/104 and 105> and undo screws <3/149>.
6. Loosen the connectors in the motors.
7. Disconnect the connection boxes in the motors.
8. Feed the cabling up through the middle of axis 1.
To assemble 1. Assemble in the reverse order.

Table of Contents

Other manuals for ABB IRB 1400

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB IRB 1400 and is the answer not in the manual?

ABB IRB 1400 Specifications

General IconGeneral
BrandABB
ModelIRB 1400
CategoryRobotics
LanguageEnglish

Related product manuals