The mounting points on the dispenser differ depending on whether you are
installing a Legend or a Laser. Installation Diagrams (see page 85)
1. Make sure that the dispenser is located on a solid, horizontal foundation or
plinth.
2. Seal the supply pipes to prevent dirt, moisture, or water from entering
during the mounting process.
3. Mark out the mounting points on the foundation, using the correct footprint
diagram for the model of dispenser being installed.
See the Legend or Laser footprint diagrams below. Installation Diagram
(see page 85)
4. Secure the dispenser with 12 mm dynabolts and washers. 12 mm
dynabolts have the required strength to hold the unit but up to 16 mm x 75
mm dynabolts can be used in the 20 mm footprint holes.
1. Make sure that your work area (including the vice, workbench, tool storage
area, and floor) is totally clean of particles or previous work. Cleanliness
and correct assembly practice can avoid most seal problems.
2. Make sure that the gas inlet pipes are properly supported before
connection.
3. Refer to one of the following procedures, depending on the fitting that you
are using:
SAE Fittings (see page 87)
Adjustable SAE fittings (see page 87)
Compression tube Fittings (see page 88)