Checking readiness for operation
– Whenever the breathing valve is changed.
– Whenever the ventilator has been stripped down /
assembled.
– At least every six months.
If the readiness for operation check is not carried out,
the patient may be placed at risk.
Connecting the test lung 84 03 201
The test lung comprises an elbow connector for con-
nection to the Y-piece, a catheter connector dia. 7 to
simulate the resistance of the airways and a 2 L breathing
bag to simulate the compliance.
● Detach angled connector from flow sensor.
● Push elbow connector into patient connection of flow
sensor.
Connecting the gas supply:
● Open cylinder valve slowly and fully.
or:
● Push gas probe firmly into the terminal unit until it
engages.
Checking readiness for operation
28
03529033