Eaton 93PR 15-80 kW UPS
Installation and Operation Manual
24
Copyright © 2022 Eaton Corporation plc. All rights reserved.
Table 3-3: Requirements on rated input/output and external wiring of the UPS (unit:mm
2
)
Rated capacity
Cross-
sectional
Refer
to IEC
62040-1
Unit
kVA
kW
15
15
20
20
30
30
40
40
50
50
60
60
Input/output voltage
Volts 400/400 400/400 400/400 400/400 400/400 400/400
AC input to the UPS
rectier
Full load current plus
battery charging
current
(3) Phases
Amps 27 36 54 72 108 144
Conductor
specications (Phase
A, B, C) (quantity and
size)
min mm2 1×6 1×6 1×10 1×13 1×20 1×25
max mm2 1×10 1×10 1×16 1×16 1×50 1×50
AC input to the UPS
bypass (ve lines,
dual inputs)
Full load current
(3) Phases
Amps 21 29 43 58 86 114
Conductor
specications (Phase
A, B, C) (quantity and
size)
min mm2 1×6 1×6 1×10 1×13 1×20 1×25
max mm2 1×10 1×10 1×16 1×16 1×50 1×50
DC input from the
battery to the UPS
(1) Root positive
wire, (1) Root
negative wire, (1)
Root N wire
Total
Amps
50 66 99 132 197 263
Conductor
specications
(positive, negative
and N)
(Quantity and size)
min mm2 1×13 1×13 1×20 1×25 1×35 1×50
max mm2 1×16 1×16 1×50 1×50 1×70 1×70
AC output to the
critical load (5 lines)
Full load current
(3) Phases
Amps 21 29 43 58 86 114
Conductor
specications (Phase
A, B, C) (quantity and
size)
min mm2 1×6 1×6 1×10 1×13 1×20 1×25
max mm2 1×10 1×10 1×16 1×16 1×50 1×50
Grounding
1.0 time
Neutral wire (N)
(AC/load) (nonlinear
load)
1.7 times
Backfeed protection
device
Electrical clearance upon breaking of contact: ≧2.0mm
Break time: ≦15s