Installation and operation manual for
conventional fire panels
EATON www.eaton.com
Technical Data 25-16733-A
Effective October 2019
Commissioning and System Handover
Commissioning
The walk test feature has been provided to facilitate the commis-
sioning of the system. See Walk Test Mode on page 26
The commissioning of the system should be conducted in accor-
dance to BS5839 part 1 Annex H.
The commissioning certificate must be completed and any vari-
ances noted.
The system configuration and variances should be recorded on the
log book.
System Handover
The following documents must be handed over to the Premises
Management of the installation:
Zone map
Commissioning certificate
Log book
User Manual
The Premises Management must be demonstrated the operation
of the system and give basic training on the operation of the
system and filling in the log book.
Maintenance
Daily Testing
To be conducted by the Premises Management.
Check that the panel shows no fire or fault indications.
If there are any fault conditions indicated then refer to Status
Indications
on page 7 to identify the problem.
Weekly Testing
To be conducted by the Premises Management.
Each week perform a Lamp Test to check that all visual and
audible indicators on the panel are functioning correctly. See
Lamp Test on page 25.
Each week a different zone should be tested. Testing with a
manual call point is the simplest method as these can be easily
triggered with the key provided. Testing with a fire detection
device is more complex as it requires specialist equipment and
may not be possible for all premises. At a minimum a different
manual call point should be tested each week.
Place the zone to be tested into test mode using the Individual
Zone Test function. See Individual Zone Test on page 25
Record the weekly test results in the log book.
Quarterly Testing
To be conducted by the Competent Person.
Check all previous log book entries and verify that any correc-
tive actions had been taken.
Carry out the weekly test and record the results in the log
book.
Visually inspect the batteries and their connections.
Disconnect the mains supply and check that the fire system is
capable of supplying the fire alarm devices by operating a call
point.
Yearly Testing
To be conducted by the Competent Person.
Carry out the weekly test and record the results in the log
book.
Carry out the Quarterly testing.
Test ALL fire detection devices and manual call points.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton EFCV2Z and is the answer not in the manual?

Eaton EFCV2Z Specifications

General IconGeneral
BrandEaton
ModelEFCV2Z
CategoryFirefighting Equipment
LanguageEnglish

Related product manuals