Chapter 3
Installation
Copyright © 2008-2010 Eaton Corporation. All Rights Reserved.
IPN 997-00012-68D February 2010
9
Chapter 3
Installation
Overview
Topic Page
Handling and Storage 9
Location 9
Unpacking and Inspection 9
Frame Assembly 12
Wiring Connection 15
Module Installation and Removal 28
Handling and Storage
If the inverter system modules or shelves are to be stored prior to installation, they should be
stored in a cool, dry, well-ventilated location where the rain, splashing water, chemical agents,
etc. will not reach based on the environment specification standard.
The equipments should be covered with a tarpaulin or plastic wrapper to protect it against dust,
dirt, paint, or other materials.
Location
The inverter system is designed for installation in a protected environment.
Factors to be considered in selecting a location include ventilation, temperature, humidity, and
accessibility. Install each unit in a clean, dry location with an unrestricted air flow and sufficient
space for rear and front access.
The inverter system will provide its full capability in ambient temperatures stated in the
Specifications on page 53
. Higher ambient temperatures will lead to a shorter life.
Gasses from the battery can be corrosive and highly flammable, so isolate the inverter system
units from the battery as much as possible.
Unpacking and Inspection
Remove the unit from its packaging and inspect it for scratches, cracks, broken connectors and
missing accessories. Refer to Inspecting the Equipment and Reporting Damage on page 8
.