IQ8 Commercial Microinverter grid-tied PV system
59 © 2023 Enphase Energy Inc. All rights reserved. November 2023
USG-00026-1.0
6.3.3 Initiate RMA in Enphase Installer Portal
Enphase Installer Portal provides an option to initiate an RMA within the array view so that the installers
can initiate an RMA with automated user flow. A Request Return link is provided when the user clicks on
the module to initiate an RMA.
Figure 41: Initiate RMA from Enphase Installer Portal
Figure 42: Enphase Installer Portal RMA details