Installation
36
Platinous User’s Manual
5.1 Installation Site Check
This section describes installation site and space requirements.
Installation Site
Install the chamber in a place which satisfies the following conditions:
•On a flat, level floor which is strong enough to bear the weight of the equipment.
•Where subject to only minimal mechanical vibrations.
•Where not exposed to direct sunlight but which is well-ventilated.
•Where ambient temperature is +10 to 25°C and free of sharp temperature fluctua-
tions. (0.1°C/min. or 3°C/30 mins.)
•In a dust-free room.
•Where not exceptionally wet or humid.
•Away from flammables and explosives.
•Where not exposed to combustible or corrosive gases.
•Near power, water, and drainage utilities.
•Not directly underneath or near fire alarms.
Note: Chamber working temperature range is 0-35°C. Using the chamber outside of this
range will lead to equipment problems. Performance is only guaranteed when in
a room 10 to 25°C.
Installation Space
The chamber requires operational and maintenance space on the left and right sides. It must also be a
safe distance from objects on the front side so that the door can be opened.