6.1 When to run performance tests
Schedule
Performance tests may be run at any time, as required. Recommendations are given in
the following table.
TestOccasion
Run the system tests in the following orderAfter system installation
1
System leakage test
2
System backpressure test
3
System test
If any of the tests fails, correct the cause of the
failure before continuing.
Run the test(s) associated with the specific module.After module addition or replace-
ment
Run the test for the specific valve.After valve membrane replace-
ment
Test the modules that may be involved in the
problem.
1
When a problem is suspected
1
Note:
Valve modules are tested for leakage only, not for valve switching function.
120 ÄKTA pilot 600 User Manual 29274559 AA
6 Performance tests
6.1 When to run performance tests

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTA pilot 600 and is the answer not in the manual?

GE AKTA pilot 600 Specifications

General IconGeneral
BrandGE
ModelAKTA pilot 600
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals