5.1 Prepare the system
Introduction
This section describes the steps that should be performed to prepare ÄKTAprocess for
a run.
Prerequisites
Before ÄKTAprocess is taken into operation, make sure that all procedures in the relevant
chapters and sections have been performed, including:
•
Chapter 4 Installation, on page 81 and
•
Actions before operation in Section 6.1 User maintenance schedule, on page 130
In this section
See pageSection
1135.1.1 Start the system and software
1155.1.2 Prepare system components
1185.1.3 Priming and leakage test
1215.1.4 Set pressure control valve parameters
1235.1.5 Final checks
112 ÄKTAprocess Operating Instructions 29-0252-49 AA
5 Operation
5.1 Prepare the system