Page #50 background imageLoading...
Page #50 background image
GE Analytical Instruments ©2006 DLM 14291 Rev. A
4-16
I N S T A L L
P U
M
P O I L
H O P C A L I T E
C E L L
C O O L E R
P U
M
P O I L
I N S T A L L E D 0 6 J U N 0 0
d a y s h o u r s
I N I T I A L 3 7 1 2
R E
M
A I N I N G 3 7 1 0
E N T i n s t a l L C L R e s c
P U
M
P O I L
D O N O T I N S T A L L
I N S T A L L
P U
M
P O I L
I N S T A L L E D 0 4 J U L 0 0
d a y s h o u r s
I N I T I A L 3 7 1 2
R E
M
A I N I N G 3 7 1 2
I N S T A L L A T I O N A C C E P T E D
To change the Supply Pressure Units
From the Pressure Units Setup Menu, select
Supply Press.
From the O
3
Supply Press Units Menu, use
the Arrow buttons to scroll to the desired
units and press ENTER.
From the Confirmation Screen, press ENTER
to save the new units.
Press CLEAR five times to return to the Main
Menu.
Setting the Consumables Installation Data
To set the installation dates:
From the Main Menu, select Maintenance.
From the Maintenance Menu, select Consumables.
From the Consumables Menu select Install.
From the Install Menu, select Pump Oil.
From the Pump Oil Menu, press ENTER, scroll to Install and press ENTER. The
Pump Oil Menu will indicate that the installation was accepted and then return
to the Install Menu.
Repeat the installation process for the Hopcalite, Cell and Cooler by selecting
each item from the Install menu, pressing ENTER, then selecting Install.
Start-up

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE MOA 280i and is the answer not in the manual?