Installation
Lifting and positioning the pole
GE Information08- 2016 L31- 200EN/07
1/4
Presentation
Necessary tools
List of the necessary Grid Solutions tools for the lifting and positionning of the
pole :
Mark Diagram Designation Number
(1)
LIFTING STRAP
”SPANSET” (3 m - 1000 kg)
2
In this module
This module contains the following topics :
Topic Page
Lifting the pole 2
Positioning the pole 3
Warning
“Procedure limited to pole installation only. For removal, contact
Grid Solutions.”
“Any faults or cracks in the column may render the procedure
dangerous.”