Preparation initial
check
Technical Catalogue
TCGB0051 rev 0 - 09/2009
24
5.1. Initial check
¡ Required Materials
Measure and Architectural Information Regarding Installation Location
¡ Remote Condenser
Check the capacity of the selected remote condenser.
¡ Installation Location
Conrm that the nal installation location is provided with convenient piping and wiring work. Strong water
runoff should be avoided.
Do not install the unit outdoors.
Install the unit in a restricted area not accessible by the general public
¡ Installation Space
Check for obstacles which hamper maintenance work in the space specied in Fig.1.
¡ Foundation
Check to ensure that the foundation is at, level and sufciently strong, taking into account the maximum
foundation gradient (Fig. 2) and the unit weight balance. Conrm elevation provision for the unit on a solid
base with an iron frame or concrete curbs shown in chap. 5.4.
In order to obtain proper clearance beneath the unit for on-the-ground installation, where foundation bolts
should be sunk into concrete.
¡ Unit
Check to ensure that the unit has been transported without damage. File a damage claim with the
transportation companies if mishandling due to transportation company negligence is suspected.
¡ Transportation
Secure the route to the nal installation location by conrming the dimensions, (Refer to the “Unit General
Data”).