a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the chassis.
3. If installed,
disconnect the tube set.
4. Disconnect all peripheral cables from the servers and chassis.
5.
Remove the chassis from the rack.
6. Remove the access panel.
7. Remove the PDB cover screws (callout 1), and then remove the cover (callout 2).
8.
Remove the energy pack:
a.
Disconnect the energy pack cable (callout 1).
b.
Lift the rear end of the energy pack from the PIB bracket (callout 2), and then remove the pack from the chassis
(callout 3).
Removal and replacement procedures
53