Interconnect bay labelsc3000 interconnect bayc7000 interconnect bayServer blade signal
3 and 45 and 6Mezzanine 2
3 and 47 and 8
3 and 45 and 6Mezzanine 3
3 and 47 and 8
For detailed port mapping information, see the HP BladeSystem enclosure installation poster or
the HP BladeSystem enclosure setup and installation guide for your product on the HP website
(http://www.hp.com/go/bladesystem/documentation).
Installing the server blade into the enclosure
NOTE: When installing additional blades into an enclosure, additional power supplies might
also be needed to meet power requirements. For more information, see the HP BladeSystem
enclosure setup and installation guide for your product on the HP website (http://www.hp.com/
go/bladesystem/documentation).
NOTE: Before installing and initializing the server blade, install any server blade options, such
as an additional processor, hard drive, or mezzanine card.
NOTE: Refer to the HP Integrity BL860c i2, BL870c i2 & BL890c i2 User Service Guide for
information regarding SAS controller configuration.
1. Remove the connector covers if they are present.
2. Prepare the server blade for installation.
Installing and powering on the server blade 37

Table of Contents

Other manuals for HP Integrity BL860c i2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP Integrity BL860c i2 and is the answer not in the manual?

HP Integrity BL860c i2 Specifications

General IconGeneral
BrandHP
ModelIntegrity BL860c i2
CategoryServer
LanguageEnglish