Rack Mount Requirements
You can rack mount your Visual Effects and Finishing system. Plan for
sufficient space in your rack mount chassis to install the following components:
■ An HP xw9400 system
■ An AJA OEM-2K breakout box
■ A Miranda DVI-Ramp2, if your workstation uses one
■ A Stone
®
Direct storage chassis (XR model)
■ Additional Stone Direct expansion chassis (XE model), as required
The form factor units of these components are provided in the following table.
Required Rack
Space
Form
Factor
QuantityComponent
5U5U1HP xw9400
1U1U1AJA OEM-2K breakout box
1U1U1Miranda DVI-Ramp2
2U2U1Stone Direct storage chassis (XR)
2U2U1Stone Direct expansion chassis (XE)
(each)
Avoiding Damage from Static Electricity
When installing any hardware equipment, take the following precautions to
prevent damage to sensitive components from static discharge:
■ Make sure power is turned off on the component you are working on. It
is a good idea to unplug components until all other connections are
configured.
■ Always wear a grounded static wrist strap. Attach the strap's alligator clip
to any grounded metal surface on the component's chassis that you are
working on. Place the wristband around your wrist.
Rack Mount Requirements | 9