6.3 Hoisting Power Cables onto a Tower
This section describes the procedure for hoisting power cables onto a tower and the precautions
that must be taken.
Context
Cabling requirements for power cables are met. For details, see 8.1 Cabling Requirements.
Procedure
Step 1 Wrap a packing bag or tape around power cable connectors, use a sling as a lifting sling to secure
the power cables 0.4 m (1.31 ft.) away from the power connectors, and use the other sling as a
traction sling to secure the power cables 4.4 m (14.44 ft.) away from the power connectors, as
shown in Figure 6-8.
Figure 6-8 Binding power cables
(1) Lifting sling
(2) Traction sling
Step 2 Hoist the power cables onto the tower, as shown in Figure 6-9.
RRU3201
Installation Guide 6 Hoisting an RRU and Related Cables onto a Tower
Issue 06 (2012-04-16) Huawei Proprietary and Confidential