6 Commissioning
● Wear personal protective equipment and use dedicated insulated tools to avoid
electric shocks or short circuits.
6.1 Checking Before Power-On
Table 6-1 Checklist
No.
Check Item Acceptance Criteria
1 SUN2000 installation The SUN2000 is installed correctly and
securely.
2 Smart Dongle The Smart Dongle is installed correctly
and securely.
3 Cable routing The cables are routed properly as
required by the customer.
4 Cable ties Cable ties are evenly distributed and no
burr exists.
5 Reliable grounding The PE cable is connected correctly and
securely.
6 Switch DC switches and all the switches
connecting to the SUN2000 are OFF.
7 Cable connection The AC output power cable, and DC
input power cables are connected
correctly and securely.
8 Unused terminals and ports Unused terminals and ports are locked
by watertight caps.