Follow these steps to attach the distributed pedestal to the counter:
1. Using the template (see Figure 61 on page 89) as a guide, mark the screw hole
locations for drilling through the counter. Use 8-mm bit or 5/16-in. bit to drill the
four screw holes.
Note:
To route cables through the counter, drill two 2.2-mm (7/8-in.) holes
through the counter. Trim the remaining material between the holes with
a small saw or chisel.
2. Place the pedestal so that the mounting bolts align with the counter screw
holes.
3. Use the enclosed M6 screws to secure the pedestal to the counter as shown in
Figure 19 on page 20. The slots located in the metal support bracket allow you
to position the pedestal for maximum stability.
Routing the cables for the distributed pedestal
1. Remove the trough cover from the distributed pedestal.
2. Route the video cable down through the distributed pedestal (as shown
Figure 20) and leave it unconnected.
Figure 20. Video cable routing direction
Distributed pedestal instructions
Update November 2005
Chapter 2. Installing the IBM 4820 21
|
|
|
|
|
|
|
||