Connecting the power cords
__ If your server is equipped with a retention bracket, route the power cord under the bracket before you
plug it into the back of the server as shown here:
__ Plug the power cords into the system, display, and attached devices.
Starting your workstation
__ Power the system on.
Note: Expect a delay between the time that the power is applied to the server or workstation and the time that
an initial program load (IPL) can be performed. When power is initially applied to the server or workstation, the
service processor performs a self-check and leaves the control panel blank for up to two minutes. You must wait
until the C1XX XXXX progress codes are complete and the control panel displays 01 before you perform an IPL or
change the control panel functions.
After you finish
_ Return to your initial setup checklist and complete the next step.
Related concepts
Installing features and replacing parts
Related tasks
Accessing the ASMI using a Web browser
Accessing the ASMI using an ASCII terminal
Powering the system on and off
Related reference
References
Related information
Adapters, Devices, and Cable Information for Multiple Bus Systems
Cabling a 9111-285 and the Hardware Management Console (HMC)
Learn how to cable the expansion units, connect the external cables, power cords, and HMC cables, attach
devices, and route the cables after you install all of your hardware features or replace parts.
Cabling your server 137