CHAPTER 9
CHAPTER 9 - CTRLMAX OPERATION
9.4. Status Line Messages
Standby - Indicates that the EXALT is ready to respond
when a demand is received.
CH Demand - A central heating call has been received.
DHW Demand - A domestic hot water call has been
received.
CH/DHW Demand - Central heating and domestic hot
water calls are being received simultaneously. Both calls
are being satised simultaneously because domestic
hot water priority has been disabled.
DHW Priority - Central heating and domestic hot wa-
ter calls are being received simultaneously. Domestic
hot water call is being satised rst because it has prior-
ity over central heating calls.
Priority Timeout - Central heating and domestic hot wa-
ter calls are being received simultaneously. The domestic
hot water priority time limit has been exceeded. Priority
will now switch back and forth between central heating
and domestic hot water calls until one call is satised.
External Demand - An external modulation call has
been received.
Slave Operation - The EXALT is a slave in a cascade sys-
tem.
Manual Operation - The burner or circulators have
manually been enabled in the Installer Menu.
CH Burner Delay - The burner will not re until the call
blocking time has elapsed.
DHW Burner Delay - The burner will not re until the
call blocking time has elapsed.
CH Setpoint Reached - The burner is not red because
the supply/system water temperature exceeds the set-
point. The central heating circulator(s) continue(s) to
operate and the burner will re again once the supply/
system water temperature drops below the setpoint.
DHW Setpoint Reached - The burner is not red be-
cause the supply/system water temperature exceeds the
setpoint. The domestic circulator(s) continue(s) to oper-
ate and the burner will re again once the supply/system
water temperature drops below the setpoint.
CH Post Pump - The central heating circulator(s) is/are
running to remove heat from the EXALT at the comple-
tion of a call.
DHW Post Pump - The domestic hot water circulator(s)
is/are running to remove heat from the EXALT at the
completion of a call.
Freeze Protection - The burner is red because the
freeze protection feature has been activated. Freeze
protection will end once the supply/system water tem-
perature is raised to 60°F [16°C].
Boiler Protection - The burner ring rate is being re-
duced because of an excessive dierence between the
boiler supply and return temperatures. The ring rate
will begin increasing once the temperature dierence
is less than 45°F [25°C].
Low Water Pressure - The system pressure has dropped
to 10.1 psi. The EXALT will still respond to calls until the
pressure drops below 7.2 psi. Increase system pressure
to 14.5 psi to clear Low Water Pressure warning
Lockout Description - The lockout which currently
has the EXALT shut down is displayed

Table of Contents

Other manuals for IDEAL EXALT COMBI

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IDEAL EXALT COMBI and is the answer not in the manual?

IDEAL EXALT COMBI Specifications

General IconGeneral
BrandIDEAL
ModelEXALT COMBI
CategoryBoiler
LanguageEnglish

Related product manuals