Acceptance and Installation
Copyright © Itech Electronic Co., Ltd. 9
Connect the plug on the other end of the power cord to your AC 220V power
source. Connect the three terminals brown to line (L), blue to neutral (N),
and yellow-green to ground (PE) on the other end of the power cord to your
AC distribution panel.
1.5 Connecting the DUT
Before connecting the DUT
Test lines are not standard accessories of the instrument. Please select
optional red and black test lines for individual sales based on the maximum
current value. For specifications of test lines and maximum current values, refer
to “Specifications of Red and Black Test Lines” in “Appendix”.
⚫ Before connecting DUT, be sure to switch off the instrument. Power
switch is in Off position. Otherwise, contact with output terminals in
rear panel may cause electrical shock.
⚫ To avoid electrical shock, before testing, please make sure the rating
values of the testing lines, and do not measure the current that higher
than the rating value. All test lines shall be capable of withstanding
the maximum short circuit output current of the power supply without
causing overheat.
⚫ If several loads are provided, each pair of load wires shall safely
withstand the rated short circuit output current of the power supply
under full load.
⚫ Always use test lines provided by ITECH to connect the equipment. If
test lines from other factories are used, please check that the test line
can withstand maximum current.
⚫ During wiring, check that the anode and cathode of the test lines are
properly and tightly connected; anode ON and cathode OFF are
prohibited.