EasyManuals Logo
Home>jcb>Front End Loaders>210S

jcb 210S User Manual

jcb 210S
414 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #241 background imageLoading...
Page #241 background image
52 - 1
Dismantling and Assembly
Main Relief Valve (MRV)
The numerical sequence shown on the illustration is
intended as a guide to dismantling.
For assembly the sequence should be reversed.
Great care should be taken when dismantling and
assembling a valve to avoid the following:-
Contamination
Damage to spools
Damage to seal grooves
Any of the above may result in possible problems with the
operation of the valve.
When Dismantling
When removing 'O' Rings and seals, use an appropriatly
rounded tool that WILL NOT cause any damage to the seal
grooves.
Discard ALL 'O' Rings and back-up rings. DO NOT use
worn or damaged items.
Inspection
Inspect the valve components for scratches, nicks or any
other type of damage, replace with new if required.
When Assembling
Renew all 'O' rings and back-up rings.
Lubricate parts with JCB Hydraulic Fluid before assembling.
Make sure that all the parts move freely.
Make sure that the ‘O’ rings and back-up rings are fitted the
correct way, items 10 and 11.
Adjust pressure setting as required, refer to Service
Procedures, Pressure Testing - MRV and ARV’s.
Torque Settings
Item Nm kgf m lbf ft
3 5.4 0.6 4
Section E Hydraulics
9803/7130
Section E
52 - 1
Issue 1
Loader Valve
www.WorkshopManuals.co.uk
Purchased from www.WorkshopManuals.co.uk
www.maskinisten.net

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb 210S and is the answer not in the manual?

jcb 210S Specifications

General IconGeneral
Brandjcb
Model210S
CategoryFront End Loaders
LanguageEnglish

Related product manuals