EasyManua.ls Logo

Jetmaster 18f - Trimming T He U Pper a Nd L Ower B AfFles; Notice Plate; Carbon Monoxide (CO) Alarm; Cleaning up

Jetmaster 18f
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TrimmingtheUpperandLowerBafes
Toimproveuedrawandsmokedischargethelowerandupperbafesmaybetrimmedbackeachend.Allow
theappliancetocool.Removethelowerandupperbafesasdescribedintheappliancepreparationsection.
Theupperbafemaybetrimmedbackby15mmto25mmeachendandeachlowerboardbafetrimmedback
10mmto15mmfromtheirouteredges.Trimmingcanbecarriedoutusingnormalwoodcuttinghandtools.Ret
thebafesandretest.Thisisnotasolutiontoovercomepoorchimneydesign.Ifafterfurtherretestingthis
cannot be resolved then further investigation will be required or seek expert advice. Advise the customer not to
usethereuntilexpertadvicehasbeensought.
Trimmingthelowerbafessidesandfrontedges
Upperbafeboard Trimmingtheupperbafe
Notice Plate
Ensure that any notice plate is provided in line with the building regulations J4. The notice should contain
informationontheperformancecharacteristicsofthehearth,replace,ueorchimneyandistobexedinan
appropriate place.
Carbon Monoxide (CO) Alarm
Fit a carbon monoxide (CO) alarm in the room where the appliance is located. Adhere to local regulations and
the manufacturers instructions when siting the detector position.
Cleaning Up
Immediatelyafterinstallation,thevisiblepartsofthereshouldbecleanedup.Thereafter,thesurfacesmaybe
kept clean by using a light brush to remove dust and by occasional wiping with a lint-free cloth.
Lighting after installation
The Jetmaster should not be run hard until any surrounding cement and plasterwork is completely dry and
cured.
A. 7 days drying time if the house has other forms of heating.
B. Atleast14daysiftheinstallationisinaneworunoccupiedproperty,oristtedintoacompletelynew
chimney breast.
21

Table of Contents

Related product manuals