EasyManua.ls Logo

Jetmaster 18f - Protection of Heat; Additional Protection of Heat; Operating Instructions; Lighting after Installation

Jetmaster 18f
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
Protection of Heat
Aheatshieldisavailableasanoptionalextra.Tottheheatshield
seesectionon“ttingtherearheatshield”.Thedistanceto
combustiblematerialwillbereducedwhentheheatshieldistted.
Additional Protection of Heat
Asonallheatproducingappliancestheuseofammablewallcoveringsdirectlyaboveortothesidesofthe
remayleadtoarehazard.Pleasebearthisinmindwheninstallingtheapplianceordecorating.Dueto
theextremetemperaturesthatcanbeachievedabovetherealwaysensurethatanyTV’s,paintingsorother
combustible items that may be near do not become excessively hot. For TV’s always consult the manufacturers
instructions to see if exposure to heat will cause damage.
Ifindoubtalwaysconsultthebuildingregulationsregardingtheproximityofcombustiblematerials.
Operating Instructions
Lighting after Installation
A Jetmaster should not be run hard until any surrounding cement and plasterwork is completely dry and cured.
As a basic guide the installer should
a. Allow a 7-day drying time if the house has other forms of heating.
b. Allowatleast14daysiftheinstallationisinaneworunoccupiedproperty,oristtedintoacompletelynew
chimney breast.
Operating Tool
The operating tool serves two functions.
It is used to open the door and to operate the air control lever.
Combustible Wall
Heat Shield
Stove
Rear Rear Heat
Model No Heat Shield Shield Fitted
Sides Back Sides Back
18f 600mm 800mm 600mm 250mm
60f - - - -
250mmwithHeatShieldtted

Table of Contents

Related product manuals