EasyManuals Logo
Home>Keithley>Multimeter>2701

Keithley 2701 Service Manual

Keithley 2701
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #146 background imageLoading...
Page #146 background image
Model 2701 Service Manual Calibration Reference B-7
:DATE
(:CALibration:PROTected:DATE)
Purpose To send the calibration date to the instrument.
Format :cal:prot:date <year>, <month>, <day>
Parameter <year> = 1999 to 2098
<month> = 1 to 12
<day> = 1 to 31
Query format :cal:prot:date?
Response <year>, <month>, <day>
Description The :DATE command allows you to store the calibration date in instrument
memory for future reference. You can read back the date from the
instrument over the bus by using the :DATE? query or the CALIBRATION
selection in the front panel CAL menu.
NOTE The year, month, and day parameters must be delimited by commas.
Example :CAL:PROT:DATE 1999,12,16 Send cal date (12/16/1999).
:CAL:PROT:DATE? Request cal date.
:NDUE
:CALibration:PROTected:NDUE)
Purpose To send the next calibration due date to the instrument.
Format :cal:prot:ndue <year>, <month>, <day>
Parameter <year> = 1999 to 2098
<month> = 1 to 12
<day> = 1 to 31
Query format :cal:prot:ndue?
Response <year>, <month>, <day>
Description The :NDUE command allows you to store the date when calibration is next
due in instrument memory. You can read back the next due date from the
instrument over the bus by using the :NDUE? query or the front panel CAL
menu.
NOTE The next due date parameters must be delimited by commas.
Example :CAL:PROT:NDUE 2000,12,16 Send due date (12/16/2000).
:CAL:PROT:NDUE? Request due date.

Table of Contents

Other manuals for Keithley 2701

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keithley 2701 and is the answer not in the manual?

Keithley 2701 Specifications

General IconGeneral
BrandKeithley
Model2701
CategoryMultimeter
LanguageEnglish

Related product manuals