Applicable operations
7 Lifting N
METHOD OF WORK
• Avoid operating the bucket cylinder and arm cylinder to the end of their stroke.
• Use the maximum specific gravity 1.8 t/m
3
• Take care when using the super long front machine on soft ground. Ensure the ground has sufficient
strength to support the weight of the machine with loaded bucket before commencing operations.
• Where possible, avoid using the super long front machine on slopes.
• Do not use this equipment for compacting slope faces.
• When travelling, lower the boom, pull in the arm, keep the work equipment parallel to the track and travel
slowly.
• Do not use any bucket with a capacity greater than shown in this table.
Buckets which do not conform to this table must not be used.
Item
Unit PC360LC-11 22m
Max digging radius  mm 1100
General Purpose Bucket, material density 1.8 t/m
3
• Capacity (ISO)
 m
3
0.47
• Maximum Width
 mm 955
• Maximum Weight
 kg 575
General Purpose Bucket, material density 1.2 t/m
3
• Capacity (ISO)
 m
3
0.63
• Maximum Width
 mm 955
• Maximum Weight
 kg 650
Powered attachment
• Maximum Weight at the end of the arm
 kg 800
Ditching Bucket, material density 1.5 t/m
3
• Maximum Weight at the end of the arm
 kg 1300
• Maximum Width
 mm 2100
Values shown are in accordance with EN474-5:2006+A1:2009 (E)
WARNING
Do not use any attachment which imposes vibration loading onto the equipment.
WARNING
Never slew the machine if no work equipment is fitted.
WARNING
Take care when raising the work equipment to its highest point. Make sure the machine is in a stable
condition at all times.
SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS
6-30