14. STEERING HANDLEBAR/FRONT WHEEL/FRONT
BRAKE/FRONT SHOCK ABSORBER/FRONT FORK
14-5
GRAND DINK 250
Lubricate the throttle grip front end with
grease and then install the throttle grip.
Connect the throttle cable to the throttle grip.
Install the right and left handlebar switches
and tighten the screws.
Install the front and rear brake master
cylinders.
FRONT WHEEL
REMOVAL
Jack the motorcycle front wheel off the
ground.
Remove the front axle nut to pull out the axle.
Remove the front wheel and the speedometer
gear unit.
INSPECTION
AXLE RUNOUT
Set the axle in V blocks and measure the
runout using a dial gauge.
The actual runout is ½ of the total indicator
reading.
Service Limit: 0.2mm replace if over
Throttle Grip
Throttle Cable
Bol