�
�
PRISM BOX UNIT
1. Assemble of Penta Box Section
#286
#288
G4
#275
2
G9
#282
#278
#294
#293
#296
#279
#290
#692
2
B2003
#295
#618
2
#299
G5
B1011
#287
#281
#297A
D
G3
#284
Hook the 3 claws of the main
prism box #281 on both
shoulders of sub-prism box
#282.
The solder bridging between the
AE SPD retainer plate #290 and
the In Finder Metering FPC is
performed after the AE SPD
position adjustment.
#1046
B261
3 claws
After put G5 in #281
Quick-drying glue
to the grooves where #293
and #284 are inserted
Screw lock
Coating
#275 ATTACH POSITION
Extrusion is
not allowed.
Gap 00.5mm
#275
Direction for position
TA-0008
(20
7.5)
00.5mm
Paste up the tape on
the other side too.