Install a Switch Unit
a.
Open the ejector arms so that they are fully open (panel 1).
b.
Install the new switch unit into its slot in the server until the ejector arms
begin to engage (panel 2).
c.
Press the arms back toward the switch unit, and then press the arms firmly
against the switch unit to fully seat it back into the server (panel 3).
The lever should click into place when the switch unit is fully seated in the server.
2.
Reinstall the fan modules that you removed from the faulted switch unit.
See “Install a Fan Module (Switch Chassis)” on page 186.
3.
Check the event logs to determine whether an FPGA update is required and
update the firmware, if needed.
-> show /SP/logs/event/list/
Event ID Date/Time Class Type Severity
1278 Tue Dec 15 16:25:27 2015 Chassis Log major
/SYS/SWU0/FPGA update required.
If an FPGA update is required, refer to the SPARC M8 and SPARC M7 Servers Product Notes
for information about performing the update.
4.
Restart the server, if needed.
-> start /System
5.
Verify that the fault has been cleared and the replaced component is operational.
See “Verify That a Fault Has Been Cleared” on page 54.
6.
Return the replaced component to Oracle.
See “Prepare a Component for Return to Oracle” on page 64.
Related Information
“Remove a Switch Unit” on page 194
“Remove a Fan Module (Switch Chassis)” on page 184
“Switch Chassis Cooling Zones” on page 31
198 SPARC M8 and SPARC M7 Servers Service Manual • September 2017

Table of Contents

Other manuals for Oracle SPARC M8

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle SPARC M8 and is the answer not in the manual?

Oracle SPARC M8 Specifications

General IconGeneral
BrandOracle
ModelSPARC M8
CategoryServer
LanguageEnglish

Related product manuals