ENGINE
2.2
ENGINE INSTALLATION NOTES
General Items
1. Install previously removed components using new gaskets, seals, and fasteners where applicable.
2. Perform regular checks on fluid levels, controls, and all important areas on the vehicle as outlined in the daily
pre-ride inspection checklist.
Exhaust
1. Replace exhaust gaskets. Seal connections with high temp silicone sealant.
2. Check to be sure all springs are in good condition.
Engine Break In Period
Engine Break-In Period is defined as the first 10 hours of engine operation, or 2 full tanks of fuel.
1. Use only Polaris Premium 2 cycle engine oil. Never substitute or mix oil brands. Serious engine damage can
result.
2. Use fuel with a minimum octane of 87 (R+M)/2 method.