Checklist
The list of tasks detailed below should be carried out annually. The time of each task is an estimate.
The following tasks must be performed with the equipment completely off (no voltage at all, stopped,
uncharged and isolated):
POWER REVISION (STATUS 1)
Environmental conditions – Visual check
Enclosure state – Visual check
Make sure the equipment can be accessed remotely - connection to the PC if it exists.
Display operation - visual and manual check
Main temperatures within range - remote check, if it exists.
Ventilation system and absence of vibrations - visual and auditory check
Charge connector operation - visual and manual check
Charge test recommended (optional)
Operation of the differential switch - Visual and manual check (optional)
Filters - visual check and replacement
Cables and conductors - visual and manual check
External and internal tightening torques - manual check
Control circuit and protections - manual check