57
ESP-LXIVM Series Controllers
The Seasonal Adjust by Month review screen appears with sea-
sonal adjustment percentage shown for the first allowed month.
Press the + and – keys to see Seasonal Adjust percentage for
other months as desired, then press Next.
The Rain Delay review screen appears with number of days
remaining until next watering date shown. Press Next.
PGM 01
Seasonal Adjust
by Month
Jan 50%
Rain Delay
Irrigation will run after the
selected date
From:
To:
Mon 29 Apr 2019
Fri 26 Apr 2019
4 days
The Calendar Day Off review screen appears with all selected cal-
endar days off shown. Press Next.
The Station Delay review screen appears with time delay between
stations shown. Press Next.
Calendar Day Off
Unused
Day 2:
Unused
Day 3:
Unused
Day 4:
Unused
Day 5:
Day 1:
4 July 2019
Station Delay
Delay Between Stations
00 : 20
MM :SS
PGM 01
The Cycle+Soak Minutes review screen appears with the
Cycle+Soak times for each station shown. Press Next.
The Master Valve Assignment review screen appears with MV and
associated FloZone information shown. Press Next.
Cycle+Soak Minutes
STA
001
Cycle
02
Soak
05
MV Assignment
FZ MVSTA 12345678910
0013 NYNYNNNYNNN
The Weather Sensor Assignment review screen appears with sta-
tions that use sensor override shown. Press Next.
The Water Window review screen appears with water window
open time, close time and duration shown. Press Next.
Weather Sensor Assignment
LocWSSTA
1234567
0013 NYNYNNNYN
PGM 01
Open:
Close:
10:00 PM
02:00 AM
04:00Duration:
HH:MM
Water Window
The Maximum Number of SimulStations for program review
screen appears with the maximum number of stations that can
operate simultaneously for that program are shown. Press Next.
The Maximum Number of SimulStations for controller review
screen appears with the maximum number of stations that can
operate simultaneously for that controller are shown. Press Next.
PGM 01
SimulStations
Maximum Number of
Irrigation 3
SimulStations
Program
Controller
SimulStations
SimulStations
Maximum Number of
Non-Irrigation 1
Irrigation 3
A confirmation screen shows the process is complete.
Contractor Default
Backup Stored
Backup