d04094
page 10 - 11
Jan. 01/2007
Effectivity: 447 SCDI, 503 DCDI,
582 DCDI
OM Edition 1 / Rev. 0
BRP-Rotax
10.3) Standard operation
To warrant reliability and efficiency of the engine, meet and carefully observe
all the operating and maintenance instructions.
10.3.1) Before engine start
Carefully read and comply with the following guidelines:
— Daily checks (section 10.3.2)
— Pre-flight checks (section 10.3.3)
— Start
The life span of the engine depends to a great extent on compliance
with these guidelines.
◆ NOTE: Prior to engine start verify that installation is
complete and make sure that all engine controls
are easily accessible and that you can operate
them instinctively without hesitation.
◆ NOTE: Secure the area accordingly.