EasyManuals Logo
Home>S&C>Controller>6801

S&C 6801 User Manual

S&C 6801
89 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #59 background imageLoading...
Page #59 background image
Switch Control Setup
Netlist Verbose Logging
When enabled, all Netlist-related event messages will be logged. The default is the
Disabled setting because Netlist logging quickly lls log memory and should only be
used for troubleshooting a specic situation.
IntelliTeam Verbose Logging
When enabled, all IntelliTeam restoration system event messages (excluding Netlist-
related events) will be logged. The default is the Disabled setting because IntelliTeam
system logging quickly lls log memory and should only be used for troubleshooting a
specic situation.
Comm Check Runner Timeout
When this timer expires before the Communications Check Runner cycle is complete,
the Netlist push is incomplete. (Range: 30-500 seconds; Step: 1; Default: 120)
Data Runner Start Delay
This sets the interval between the completion of one Data Runner cycle (to collect and
distribute real-time data) and the start of the next Data Runner cycle. (Range: 0-60;
Step: 1; Default: 3)
Data Runner Timeout
When this timer expires before the Data Runner cycle is complete, a new Data Runner
cycle is started. (Range: 20-120 seconds; Step: 1; Default: 30)
Request Timeout Delay
This sets the time interval between rmware upload completion and the subsequent
request for a new Netlist. This delay also applies when a new control is deployed, it will
wait this time interval before requesting a new Netlist. (Range: 1-65,535 seconds; Step:
1; Default: 40)
Report Periodic Delay
This sets the time interval between each Netlist transmission. (Range: 1-65,535 seconds;
Step: 1; Default: 60)
DNP-IP Address Mapping
Map IP addresses to DNP/RTU addresses for team members that are accessible only
over an Ethernet port. An entry must be included in this table for any team member
where Ethernet is the congured Comm Port to Use setting. The DNP Address value
is the DNP/RTU address for the IP-based team members. The IP Address value is the
IP address associated with the destination team members.
Figure 27. The Setup>Restoration>IntelliTeam SG>Distributed Generation screen.
These settings are used for IntelliTeam systems with distributed generation resources
(e.g. solar, wind, etc.) on the circuit. See Figure 27.
Distributed Generation
S&C Instruction Sheet 1045-530 59

Other manuals for S&C 6801

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the S&C 6801 and is the answer not in the manual?

S&C 6801 Specifications

General IconGeneral
BrandS&C
Model6801
CategoryController
LanguageEnglish

Related product manuals