3-1
MP270 Equipment Manual
Release 01/99
Commissioning
Flowchart
The following information on commissioning explains the individual steps which
need to be taken to start up the MP270. Figure 3-1 illustrates the most important
steps for the initial startup, recommissioning and normal operation of the MP270.
Download configuration data to the MP270
COM1/2
During the start-up phase, switch the
MP270 to download mode (refer to
Page 3-3)
Switch on the MP270’s power supply.
Initial startup
There is no configuration
available in the MP270.
Recommissioning
The MP270 already contains
a configuration but needs to
operate with a different one.
Normal operation
The MP270 is operated with
the configuration which is
currently loaded.
Start screen
PC/PU
MP270
Figure 3-1 Commissioning flowchart
3