3060386 | Geniox Air Handling Unit - User Manual
Star-up, adjustments, use and commissioning | 25
Date: ____________
Job Name: ______________
Job Address: ______________________________________________________________________________
________________________________________________________________________________________
Model Number: ___________________________________________________________________________
Serial Number: ____________________________________ Unit Tag: _________________________________
Startup Contractor: _________________________________ Phone: __________________________________
Address: _________________________________________________________________________________
________________________________________________________________________________________
Pre Startup Check List
Installing Items to Verify
1. Is there any visible shipping damage? Yes No
2. Is the Unit Installed Level?
Yes No
3. Are all clearances Adequate for service and operation?
Yes No
4. Do all access doors open freely and are the handles operational?
Yes No
5. Have all electrical connections been checked for tightness?
Yes No
6. Does the electrical service correspond to the unit name plate?
Yes
No
7. Are the VFD O/L protection entered based on the nameplate
Yes No
8: Have all the set screws on the fans been tightened?
Yes No
9: Do all fans rotate freely
Yes No
10: Have all dampers assemblies been inspected?
Yes No
11:Arealltheltersinstalledcorrectly?
Yes No
12: have the condensate drains and traps been installed correctly
Yes No
H.3 Geniox site commissioning template
Supply Fan Assembly
Alignment
Check Rotation Nameplate Amps: _______
No. Fans HP L1 (Amps) L2 (Amps) L3 (Amps)
1
2
Belt Size: _______
VFD Frequency: _________ Isolation Operate Correctly