Tyco Electronics Galaxy SC Controller J85501F-1
Issue 13 February 2001 Feature Descriptions 7 - 8
be configured. Please refer to “Universal Reserve Time Prediction” later
in this chapter.
Configuration may be done locally at the front panel or remotely via
EasyView interface.
Basic: MENU → CONFIG.. → BAT TEST
Intelligent: MENU → CONFIG.. → BAT MNGR → BAT DISCH..
EasyView: Config → Battery Management → Reserve
The test can be controlled either locally at the front panel or remotely via
EasyView interface by toggling the BAT DISCH TST software switch.
Basic: MENU → MAINT OPER.. → BAT DISCH TST
Intelligent: MENU → MAINT OPER.. → BAT DISCH TST
EasyView: Control → Battery Test
Battery Sections The Galaxy SC supports up to 32 battery sections. A battery section is 1
or more battery strings connected to a common battery shunt. Each
battery section contains the following items:
contactor Battery disconnect contactor (CN1,
CN2, or no contactor). (See LVD
feature)
contactor state Battery contactor state (See LVD
feature). This is a read-only item.
number of strings Number of strings in the section. This
item is used for the battery section
reserve time prediction algorithm. (See
Universal Reserve Time Prediction
algorithm).
battery type Battery used in section. This item is
used for the battery section reserve time
prediction algorithm. (See Universal
Reserve Time Prediction Algorithm).