EasyManuals Logo
Home>WAGNER>Control Unit>EPG-Sprint X

WAGNER EPG-Sprint X User Manual

WAGNER EPG-Sprint X
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #86 background imageLoading...
Page #86 background image
86
PXM
OPERATING AND ASSEMBLY MANUAL
VERSION 08/2015 ORDER NUMBER DOC2350372
The maintenance intervals should be adapted by the operator depending on the level of
use and if necessary the level of soiling.
If in doubt, we recommend contacting J. Wagner AG's specialist personnel.
The valid health and safety speci cations and safety instructions provided in Chapter 4
must be adhered to for all maintenance work.
Maintenance work Time stamp
Check ultrasonic sieve cloth * per shift
Check  uid unit per shift
Check the air hose of level probe for blockages per shift
Check that the  uid rods of the workstation are not bent weekly
Check that the  uid rods  uidize evenly weekly
Check injectors weekly
Check integrated IP 5000 fresh powder pump weekly
Check  lter cartridges for secure  t and retighten if necessary monthly
* For more information, see ultrasonic sieve operating manual
8.3.3 MAINTENANCE PROCEDURES

Table of Contents

Other manuals for WAGNER EPG-Sprint X

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the WAGNER EPG-Sprint X and is the answer not in the manual?

WAGNER EPG-Sprint X Specifications

General IconGeneral
BrandWAGNER
ModelEPG-Sprint X
CategoryControl Unit
LanguageEnglish

Related product manuals