EasyManuals Logo
Home>ABB>Measuring Instruments>AO2000 Series

ABB AO2000 Series User Manual

ABB AO2000 Series
362 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #117 background imageLoading...
Page #117 background image
AO2000 CONTINUOUS GAS ANALYZERS | OI/AO2000-EN REV. B 117
Connecting the signal lines
1 Only for the wall-mount housing (model EL3040): Pass the cables through
the screwed cable glands and strip to a length of approx. 20 cm (8 in).
M20: Remove the plugs from the insert; and leave the ring in the screwed
cable glands for sealing and strain relief.
M32: Remove the plugs from the screwed cable glands. If required, slit
open the insert with drill holes from the accessories pack and press over
the cable; seal any open drill holes with dowel pins from the accessories
pack.
2 Connect the lines to the mating plugs as shown in the connection dia-
grams of the I/O modules.
3 Attach the mating plug to the plug-in terminal strips on the
I/O modules.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB AO2000 Series and is the answer not in the manual?

ABB AO2000 Series Specifications

General IconGeneral
BrandABB
ModelAO2000 Series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals