106
08424705001 (01) 2017-04 USA ⢠Accu-Chek Inform II Operatorās Manual Version 6
7.2 Performing a linearity test
Overview of test procedure A linearity test comprises the following steps:
ā Check the lot number of the linearity solutions.
ā Check the lot number of the test strips.
ā Perform the test with a minimum of three linearity
solutions.
Starting a linearity test The following description assumes that the meter is
powered on and the Main Menu is displayed.
1 Touch in the Main Menu to open the Main
Menu 2 screen.
2 Touch Linearity to start the linearity test. The Line-
arity Test screen opens.
Linearity Test
12345678?
Use Linearity L
ot
12:48 pm
03/17/17
Main Menu
Review Results
Control Test
Patient Test
12:48 pm
03/17/17
Main Menu 2
Maintenance
Strip Lots
Proļ¬ ciency
Control Lots
Beeper
Linearity
Diagnostics
Linearity Lots
Admin.
12:48 pm
03/17/17