EasyManuals Logo

Bosch D9412GV4 Installation And Operation Guide

Bosch D9412GV4
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #4 background imageLoading...
Page #4 background image
Contents
.
Bosch Security Systems, Inc. | 3/12 | F01U266054-01 4
Contents
Federal Communications Commission (FCC)
Rules ................................................................... 2
1.0 Introduction ...................................................... 7
2.0 Lightning Strikes .............................................. 8
2.1 Effects 8
2.2 Precautions during Installation ................... 8
3.0 Overview ............................................................ 9
3.1 Configuration and Parts 9
3.1.1 Parts List ......................................................... 10
3.1.2 Parts Available by Separate Order ........... 10
3.2 Accessories ..................................................... 11
3.3 Features in the GV4 Series Control Panels
............................................................................ 12
3.3.1 SDI Interconnect Wiring .............................. 12
3.3.2 Tip and Ring Posts ........................................ 12
3.3.3 Telephone Line Sniff .................................... 12
3.3.4 Points ............................................................... 12
3.3.5 Areas and Accounts ...................................... 12
3.3.6 Digital Communicator .................................. 12
3.3.7 Keypads ............................................................ 13
3.3.8 Keyswitch ........................................................ 13
3.3.9 Access Control (D9412GV4/D7412GV4) 13
3.3.10 Event Memory ................................................ 14
3.3.11 Event Log ......................................................... 14
3.3.12 Ground Fault Detection ............................... 14
3.3.13 Ground Fault Detection Added Feature .. 14
3.3.14 Conettix Functions ....................................... 14
3.3.15 Programming .................................................. 14
3.3.16 Dual Authentication ...................................... 14
3.3.17 Other Features ............................................... 15
4.0 Installation 16
4.1 Installation Preparation 16
4.2 Enclosure Options ........................................ 16
4.3 Mounting Enclosure ...................................... 16
4.4 Installing the Control Panel ........................ 17
4.5 Connecting Earth Ground ........................... 17
4.5.1 Terminal 10 ..................................................... 17
4.5.2 Ground Fault Detect Enable ....................... 17
4.5.3 Enabling Ground Fault Detection ............. 17
4.5.4 Ground Fault Specifications ...................... 17
4.5.5 Locking the Reset Pin .................................. 18
4.6 Completing the Installation ........................ 18
4.6.1 Charging the Battery .................................... 18
4.6.2 Installing and Wiring Detection Devices . 19
4.6.3 Installing Modules and Relays ................... 19
4.6.4 Connecting the On-board Points and
Keypads ........................................................... 19
4.6.5 Powering Up ................................................... 19
4.7 Updating Control Panel Firmware ............ 19
4.8 Programming the Control Panel ............... 19
4.9 Installing the Point Chart Label ................ 19
4.10 Testing the System ....................................... 19
4.11 Service Walk Test .......................................... 20
5.0 Power Supply 24
5.1 Primary Power Terminals 1 and 2
5.1.1 Primary (AC) Power Circuit
5.1.2 Installing the Transformer
5.2 Secondary Power Terminals
5.2.1 Secondary (DC) Power
5.2.2 Installing the Battery
5.2.3 Replacing the Battery
5.2.4 Battery Supervision
5.2.5 Battery Charging Circuit
5.2.6 Battery Discharge and Recharge Schedule
6.0 Power Outputs ............................................... 30
6.1 Circuit Protection
6.2 Total Available Power
6.3 Continuous Power Output Terminals 3, 8,
24, and 32
6.4 Programmable Power Output Terminals 6,
7, and 8
6.4.1 Programming
6.4.2 Terminals 6 and 7
6.4.3 Fire System Power Formula
6.4.4 Terminal 8
7.0 Telephone Connections ............................... 32
7.1 Registration
7.2 Notification
7.3 Location
7.4 Telephone Cord Connection
7.5 Phone LED (Red)
7.6 Operation Monitor LED (Green)
7.7 Dialing Format
7.8 Telephone Line Monitor
7.9 Called Party Disconnect
7.10 Communication Failure
7.11 D928 Dual Phone Line Switcher
7.11.1 Description

Table of Contents

Other manuals for Bosch D9412GV4

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Bosch D9412GV4 and is the answer not in the manual?

Bosch D9412GV4 Specifications

General IconGeneral
Power Supply12 VDC
TypeControl Panel
ModelD9412GV4
ManufacturerBosch
Operating Temperature0°C to +49°C (+32°F to +120°F)
Compatible withConettix IP, GSM, GPRS, and POTS communicators

Related product manuals