EasyManuals Logo

Bosch Rexroth BA1N User Manual

Bosch Rexroth BA1N
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #43 background imageLoading...
Page #43 background image
If both the ambient temperature and the installation altitude exceed the nomi‐
nal data:
1. Multiply the determined utilization factors f
T
and f
H
.
2. Multiply the resulting value by the data specified in the selection data.
3. Ensure that the reduced data are not exceeded by your application.
7.3 Commissioning
7.3.1 General
Commissioning of the energy storage device is only possible with further
components (drive controller, control unit).
Property damage caused by errors when
controlling BA1N! Unclear operating states
and product data!
NOTICE
Do not commission the motors if connections, operating states or prod‐
uct data are unclear or faulty.
Do not commission the motors if safety devices and monitoring units of
the plant are damaged or not in operation.
Damaged products may not be operated.
Contact Bosch Rexroth for additional information or support during com‐
missioning.
The following commissioning notes refer to energy storage devices as part of
a drive system with drive controller and control unit.
7.3.2 Preparation
1. Make sure you have the documentations of all used products ready.
2. Record all measures taken in the commissioning log.
3. Check the products for damage.
4. Check all mechanical and electrical connections.
5. Activate the safety and monitoring equipment of the system.
7.3.3 Procedure
Once all requirements are met, proceed as follows:
1. Activate the fan or the external cooling system supplying the BA1N en‐
ergy storage device and check them to verify that they are in a proper
condition. Comply with the manufacturer's instructions.
2. Commission the drive system according to the instructions of the corre‐
sponding product documentation. The corresponding information can be
found in the functional description of the drive controller.
3. Record all measures taken in the commissioning log.
For commissioning of the controllers and control systems, addi‐
tional steps may be required. Testing the functionality and per‐
formance of the systems is not part of the commissioning but is
carried out as part of the overall commissioning of the machine.
Comply with the information and instructions of the machine man‐
ufacturer.
BA1N Kinetic Energy Buffer 29/49
Commissioning and operation of BA1N energy storage device
R911393267_Edition 01 Bosch Rexroth AG

Table of Contents

Other manuals for Bosch Rexroth BA1N

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Bosch Rexroth BA1N and is the answer not in the manual?

Bosch Rexroth BA1N Specifications

General IconGeneral
BrandBosch
ModelRexroth BA1N
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals