1 About this documentation
Editions of this documentation
Edition Release
Date
Note
01 2016-06 First edition
02 2019-06 CDI+ interface supplemented
Tab. 1-1: Change Record
1.1 Overview on target groups and product phases
In the following illustration, the framed activities, product phases and target
groups refer to the present documentation.
Example: In the product phase "Mounting (assembly/installation)", the
"mechanic/electrician" can execute the activity "install" using this
documentation.
Presales Aftersales
Selection
Mounting
(assembly/installation)
Engineering
Commissioning
Operation
Decommissioning
Product
phases
Target
groups
Activities
Design engineer
Programmer
Technologist
Process
specialist
Select
Prepare
Design
Construct
Mechanic/
electrician
Unpack
Mount
Install
Programmer
Commissioning engineer
Parameterize
Program
Configure
Simulate
Technologist
Process specialist
Optimize
Test
Machine
operator
Maintenance
technician
Service
Operate
Maintain
Remove
faults
Create
the NC program
Mechanic/
electrician
Disposal company
Dismount
Dispose
Fig. 1-1: Assigning the present documentation to the target groups, product phases and ac-
tivities of the target group
1.2 Purpose
This document instructs the technical staff of the machine manufacturer on how
to perform the mechanical and electrical installation safely and on how to
commission the device.
IndraControl VPB 40.4
1/57
About this documentation
R911376309_Edition 02 Bosch Rexroth AG